Overhead Crane Installation with Safety Testing
The installation of the overhead crane involves a comprehensive process that includes assembly, positioning, and calibration to ensure smooth and efficient operation.


Skilled technicians and engineers carry out the installation, adhering to all manufacturer specifications and industry standards.
After the crane is fully installed, it undergoes a rigorous safety testing procedure. This includes:
(1) Load Testing: The crane is subjected to operational load tests to ensure its lifting capacity and stability under maximum load conditions.
(2) Safety Feature Verification: All safety devices, including emergency stop buttons, overload protection, and limit switches, are thoroughly checked to ensure they are functional
(3) Operational Test Run: The crane is operated at various speeds and loads to verify its smooth operation, accuracy, and response to commands.
(4) Inspection of Structural Integrity: A detailed inspection is carried out to check for any mechanical, electrical, or structural issues that could affect the safety or performance of the crane.
(5) Training and Documentation: Operators are trained on safe operating procedures, and all necessary safety documentation is provided to ensure compliance with industry regulations
The installation and testing phase ensures that the overhead crane is fully functional, safe, and ready for use, offering peace of mind for all operators and users involved.